{"type":"img","src":"//cdn.quv.kr/k2hl6wry7/up/5f922b2fac9a0_1920.png","height":"70"}
  • Company
  • Solution
  • Application
  • Manufacture
  • S.I / Distributor
  • Hot News
  • {"google":["Questrial","Noto Sans"],"custom":["Noto Sans KR"]}
    ×
     
     
    섹션 설정
    {"type":"img","src":"//cdn.quv.kr/k2hl6wry7/up/5f922b2fac9a0_1920.png","height":"40"}
  • Company
  • Engineering Solution
  • Application
  • Fabrication
  • S.I / Distributor
  • Hot News
  • Project Reference

       Home     >    Company     >     Project Reference

    System Engineering

    2020

     10       UGTL Project

    03~08- HIMA Himax System ESD/BMS

    03~08- Site Commissioning Supervision

    10~    GYHP Project, p&o Chemical, eTEC E&C

    10~    Emerson DCS System Engineering (DeltaV)

    03~08- P&ID Review, Interlock logic and Complex Control Loop Development.

    03~08- System implementation

    08~10  Ngodwana Energy 25MW Biomass Power Plant

    03~08- System Engineering Consulting

    03~08- P&ID Review, Interlock logic and Complex Control Loop Development.

    03~08- Waiting for Site Commissioning

    2019

    2019.12~2020.07  07~09

    YNCC Yeochun NCC, Yeosu  -3~01

    Invensys Tricon TMR (HIPPS)  -3~01

    P&ID Review and logic implementation  -3~01

    FAT   -3~01

    400KTA Ulsan PP, SK E&C  04~10

    Honeywell PCS System(DCS/ESD/FGS) Engineering  -3~01

    System & HMI Design and development  -3~01

    P&ID Review, Interlock logic and Complex Control Loop Development  -3~01

    System implementation  -3~01

    Loop Check, Function Test as part of FAT  -3~01

    FAT, SAT Completed  -3~01

    Waiting for the ISAT & Site Commissioning  -3~01

     2019.10~2020.04 08~06 

    MFC HOT Unit GS Caltex, Yeosu  -3~01

    Invensys Tricon TMR  -3~01

    P&ID Review and logic implementation  -3~01

    FAT  -3~01

    2018

    10~    2018.10~2019.08

    10~    KARBALA  Refinery Project

    03~08- System engineering for TLCS of HDEG AB PLC System

    03~08- Loop Check, Function Test as part of FAT

    03~08- Waiting for SAT & Commissioning

    03~08  EGYPTIAN REFINING Project

    03~08- HIMA Himax System ESD/FGS/BMS

    03~08- Site Commissioning Supervision

    2017

    Bahrain LNG Import Terminal Plant  03~10

    Pining Line Leakage Detection PLC System / EPC : GS E&C  03~01

    AB Controllogix System (Redundant system) 03~01

    PLC Logic Programming   -3~01

    Loop Testing, FAT (Factory Acceptance Test)  -3~01

    IFAT & SAT Site Commissioning  -3~01

    KCC PLATE GLASS CONTROL-Emerson  06~10

    AB PLC System (Single CPU)   -3~01

    PLC Logic Programming  -3~01

    Loop Testing, FAT (Factory Acceptance Test)  -3~01

    Site Commissioning   -3~01

    2017.06~2020.10  06~10

    KCC PLATE GLASS CONTROL-Emerson  06~10

    AB PLC System (Single CPU)   -3~01

    PLC Logic Programming  -3~01

    Loop Testing, FAT (Factory Acceptance Test)  -3~01

    Site Commissioning  -3~01

    2016

     10      2016.12~2017

    10       VINH TAN 4 EXTENSION THERMAL POWER PLANT

    10       DCS System - ABB / Symphony Plus

    03~08- DCS System Engineering

    03~08- System & HMI Design and Dev

     10      2016.10~2017

    10       Poseung Biomass Cogeneration Plant

    10       DCS System - ABB / Symphony Plus

    03~08- DCS System Engineering

    03~08- Logic & HMI Design and development

    03~08- Loop Check, Function Test as part of FAT

    03~08- SAT & Site Commissioning

    06~09  Jeju Hallim Raw water revamping PJT

    03~08- DCS System - ABB / Composer

    03~08- DCS System Engineering

    03~08- System & HMI Design and Implementation

    03~08- Loop Check, Function Test as part of FAT

    03~08- SAT & Site Commissioning

    2015

     2015.08~2016.08  07~09

    Karbala IONE Refinery Project, SK E&C  03~10

    Honeywell PCS(DCS/ESD/FGS) System & BMS,PKG PLC  -3~01

    System Engineering Consulting  -3~01

    P&ID Review and making comment  -7~09

    FAT (Factory Acceptance Test) Supervisor. Hoenywell PCS  07~09

    Raw Water Treatment PKG (Rockwell Automation)  07~09

    Waste Water Treatment PKG (Siemens)  07~09

    A`seeb Waste Water PJT Hyundai Rotem Company  03~10

    PLC Honeywell System (Soft master)  -3~01

    Programming and HMI Modify  -3~01

    Loop Testing, Commissioning  -7~09

    SAT (Site Acceptance Test)  -7~09

    2014

    11       SK IRPC Project

    03~08- DCS Emerson System Cabinet 4ea Engineering

    03~08- FAT Support

    06~12  HDO Project

    03~08- DCS Emerson System Cabinet 53ea Engineering

    03~08- FAT & SAT Support

    03~08- Site Survey

    2013

     2015.08~2016.08  07~09

    Panama ACP Power Plant PJT 03~10

    Hyundai Heavy industries Co.,Ltd  -3~01

    PLC Honeywell System (Softmaster) , Programming and HMI Modify   -3~01

    Loop Testing, Commissioning, Pre-FAT (Factory Acceptance Test)  -7~09

    2012

    03~11  T-GAS Power Plant PJT  Hyundai Heavy industries Co.,Ltd

    03~08- DCS Emerson System (Delta-V)

    03~08- Database arrange

    03~08- Programming and HMI Modify

    03~08- Loop Testing, Commissioning

    03~08- Pre-FAT (Factory Acceptance Test)

    2011

    LG Dow MOD5 Pilot Project  07~08

    DCS Honeywell System (ExperionPKS R310)  07~08

    DOW Program Analyzing   -3~01

    Logic & Loop Configure  -3~01

     2011.08~2012.09  07~09

    HKSilicon Yeosu Plant 03~10

    ESD Honeywell System (Safety Manager R145.1)03~10

    Causes & Effect Logic Configure   -3~01

    Causes & Effect Analyzing & Modify   -3~01

    2010

     10      2010.10~2011.03

    10       Doosan Heavy industries Co.,Ltd DCS Emerson System (Delta-V)

    03~08- Programming and HMI Modify

    03~08- Loop Testing, Commissioning

    03~08- Pre-FAT (Factory Acceptance Test)

     10      2010.12~2011.07

    10       KCC/YEOJU Plant Line 6 PJT - Hot End Control System

    10       Allen-Bradley PLC (RSLogix 5000)

    03~08- Program Analyzing & Modify

    03~08- DeltaV Graphic Modify

     10      2010.06~2011

    10       NFRI NBI system

    03~08- Design & Implementation

    03~08- DCS Honeywell System

    03~08- Commissioning Service

    2009

      2009.09~2010.05  07~09

    DOOSAN/GHECO-ONE 660MW COAL-FIRED Power Plant PJT03~10

    Doosan Heavy Industries & Construction Co., Ltd.03~10

    Design & Implementation  -3~01

    DCS Honeywell System (ExperionPks R310)  -3~01

      2009.01~2010.05  07~09

    GS E&C Yerevan Thermal Power Plant - YCCPP03~10

    Design &  Implementation  -3~01

    DCS Honeywell System (ExperionPks R310)  -3~01

    Commissioning Service  -3~01

    2008

    01~02  HONAM PETROCHMICAL

    03~08- Design &  Implementation

    03~08- DCS Honeywell System

    03~08- Commissioning Service

    2007

      2007.10~2008.05  07~09

    HANJIN LNG Carrier03~10

    DCS System Implementation  -3~01

    (Documents) / Commissioning  -3~01

      2007.07~2008.05  07~09

    DSME LNG Carrier03~10

    DCS System Implementation  -3~01

    (Documents) / Commissioning  -3~01

    2006

    06~02  YCC NCC #1 REVAMP

    03~08- DCS System Implementation

    03~08- (Documents) / Commissioning

    2005

    Hyundai Barbados 07~11

    DCS System Implementation  -3~01

    (Documents) / Commissioning  -3~01

    LG Bohai VCM - EDC07~09

    MMS GE System Cabinet 18EA Engineering   -3~01

    Engineering & Cabinet Drawing   -3~01

    FAT Support  -3~01

    2004

    12~02  Qater Petroleum

    03~08- DCS Design ( Documents )

    06~02  Gympo Landfill

    03~08- DCS Implementation - FAT & SAT Support

    03~08- Documents / Commissioning

    2003

      2003.09~2008.01  07~09

    MyungJi Incinerator 200Ton x 2EA (1ST,12End003~10

    DCS System Implementation  -3~01

    (Documents) / Commissioning  -3~01