System Engineering
2021
Dos Bocas Refinery Project, Mexico, SECㅤㅤㅤ
Honeywell PLC System (SM) Supply for Feed Filter Packageㅤㅤㅤ
PLC System (Safety Manager) Supply -ㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤ
HMI Graphic Design & Implementation -ㅤㅤㅤ
FAT -ㅤㅤㅤ
KARBALA Refinery Project, Iraq, HDGSK JVㅤㅤㅤ
AB PLC System Engineering for RWT & WWT Systemㅤㅤㅤ
Site Commissioning Supervision -ㅤㅤㅤ
UGTL Project, Uzbekistan, HECㅤㅤㅤ
Honeywell DCS System (Experion PKS) Engineeringㅤㅤㅤ
Site Commissioning Supervision -ㅤㅤㅤ
2021.04 ~
2021.04 ~
2021.01 ~
2020
2020.10 ~
2020.10 ~
2020.08 ~
ㅤ UGTL Project, Uzbekistan, HEC
ㅤㅤㅤ HIMA ESD System (Himax) Engineering
ㅤㅤㅤㅤㅤ- Site Commissioning Supervision
ㅤㅤㅤㅤㅤGYHP Project, Gwangyang, eTEC E&C
ㅤㅤㅤ Emerson DCS System (DeltaV) Engineering
ㅤㅤㅤㅤㅤ- System Design & Implementaion
- HMI Graphic Design & Implementation
ㅤㅤㅤㅤㅤ- Interlock Logic and Complex Control Loop Drawing Engineering
ㅤㅤㅤㅤㅤNgodwana Energy 25MW Biomass Power Plant,
ㅤㅤㅤ Republic of South Africa, KC Cottrell
ㅤㅤㅤ Plant Control System Engineering Consulting
ㅤㅤㅤㅤㅤ- P&ID Review
ㅤㅤㅤㅤ- Boiler, STG, BOP Control Logic & Loop Drawing Review
ㅤㅤㅤㅤ- APS (Automatic Plant Start-up) Logic Flow Chart Engineering
ㅤㅤㅤㅤ- UMC (Unit Master Control) Logic Drawing Engineering
ㅤㅤㅤㅤ- Site Commissioning Support
2019
Yeochun NCC2 Project, Yeosu, DL E&Cㅤㅤㅤㅤㅤ
Invensys Tricon TMR System (HIPPS) Engineeringㅤㅤㅤㅤㅤ
P&ID Review -ㅤㅤㅤㅤㅤ
Logic Implementation -ㅤㅤㅤㅤㅤ
FAT -ㅤㅤㅤㅤㅤ
400KTA Ulsan PP Project, Ulsan, SK E&Cㅤㅤㅤㅤㅤ
Honeywell PCS System (DCS/ESD/FGS) Engineeringㅤㅤㅤㅤㅤ
P&ID Review -ㅤㅤㅤㅤㅤ
Interlock logic and Complex Control Loop Drawing Engineering -ㅤㅤㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤㅤㅤ
HMI Graphic Design & Implementation -ㅤㅤㅤㅤㅤ
FAT (Loop Chcek & Function Test) -ㅤㅤㅤㅤㅤ
ISAT & SAT -ㅤㅤㅤㅤㅤ
Site Commissioning -ㅤㅤㅤㅤㅤ
GS Caltex MFC HOT Unit, Yeosu, GS E&Cㅤㅤㅤㅤㅤ
Invensys Tricon TMR System Engineeringㅤㅤㅤㅤㅤ
P&ID Review -
Logic Implementation -
FAT -ㅤㅤ ㅤㅤㅤ
2019.12 ~ 2020.07
2019.10 ~
2019.10 ~ 2020.04
2018
2018.10 ~ 2019.08
2018.03 ~ 2018.08
ㅤㅤㅤ KARBALA Refinery Project, Iraq, HDGSK JV
ㅤㅤㅤ AB PLC System Engineering for Truck Loading Control System
ㅤㅤㅤㅤ- System Engineering Review
ㅤㅤㅤㅤ- FAT (Loop Check & Function Test)
ㅤㅤㅤ ERC Refinery Project, Egypt, GS E&C
ㅤㅤㅤ HIMA ESD/FGS/BMS System (Himax) Engineering
ㅤㅤㅤㅤㅤ- Site Commissioning Supervision
2017
KCC Float Glass NO2 Rebuild with Emerson, Yeoju, KCC E&Cㅤㅤㅤ
AB PLC System Engineeringㅤㅤㅤ
PLC Logic Programming -ㅤㅤㅤ
FAT (Loop Test) -ㅤㅤㅤ
Site Commissioning -ㅤㅤㅤ
Bahrain LNG Import Terminal Project,ㅤBahrain, GS E&Cㅤㅤㅤ
AB PLC System Engineering for Piping Line Leakage Detectionㅤㅤㅤ
PLC Logic Programming -ㅤㅤㅤ
FAT (Loop Test) -ㅤㅤㅤ
Site Commissioning -ㅤㅤㅤ
2017.06 ~ 2017.10
2017.03 ~ 2017.10
2016
2016.03 ~ 2017.
2016.10 ~ 2017.
2016.06 ~ 2016.09
ㅤㅤㅤ Vinh Tan 4 Extension Thermal Power Plant, Vietnam, Doosan
ㅤㅤ ㅤABB DCS System (Symphony Plus) Engineering
ㅤㅤㅤㅤ- System Design & Implementation
ㅤㅤㅤㅤ- HMI Graphic Design & Implementation
ㅤㅤㅤㅤ- FAT (Loop Check & Function Test)
ㅤㅤㅤ Poseung Biomass Cogeneration Plant, Poseung, DL E&C
ㅤㅤㅤ ABB DCS System (Symphony Plus) Engineering
ㅤㅤㅤㅤ- System Design & Implementation
ㅤㅤㅤㅤ- HMI Graphic Design & Implementation
ㅤㅤㅤㅤ- FAT (Loop Check & Function Test)
ㅤㅤㅤㅤ- SAT & Site Commissioning
ㅤㅤㅤㅤJeju Hallim Water Treatment System Migration Project
ㅤㅤㅤㅤABB DCS System (Composer) Engineering
ㅤㅤㅤㅤ - System Design & Implementation
ㅤㅤㅤㅤ - HMI Graphic Design & Implementation
ㅤㅤㅤㅤ - FAT (Loop Check & Function Test)
ㅤㅤㅤㅤ - SAT & Site Commissioning
2015
KARBALA Refinery Project, Iraq, HDGSK JVㅤㅤㅤ
Honeywell PCS System (DCS/ESD/FGS) Engineeringㅤㅤㅤ
AB PLC System Engineering for Raw Water Treatment PKGㅤㅤㅤ
Siemens PLC System Engineering for WWT PKGㅤㅤㅤ
P&ID Review -ㅤㅤㅤ
System Engineering Consulting -ㅤㅤㅤ
FAT Supervision -ㅤㅤㅤ
A'Seeb Waste Water Project, Oman, Hyundai Rotemㅤㅤㅤ
Honeywell PLC System (Soft Master) Engineeringㅤㅤㅤ
PLC Logic Programming -ㅤㅤㅤ
HMI Graphic Design & Implementation -ㅤㅤㅤ
FAT (Loop Check & Function Test) -ㅤㅤㅤ
SAT & Site Commissioning -ㅤㅤㅤ
2015.08 ~ 2016.08
2015.03 ~ 2015.10
2014
2014.11
2014.06 ~ 2014.12
ㅤㅤㅤ IRPC UHV Project, Thailand, SK E&C
ㅤㅤㅤ Emerson DCS System Engineering
ㅤㅤㅤㅤ- System Cabinet (4ea) Engineering
ㅤㅤㅤㅤ- FAT Support
ㅤㅤㅤ HDO Project, Daesan, HEC
ㅤㅤㅤ Emerson DCS System Engineering
ㅤㅤㅤㅤ- System Cabinet (53ea) Engineering
ㅤㅤㅤㅤ- FAT & SAT Support
ㅤㅤㅤㅤ- Site Survey
2013
Panama ACP Power Plant, Panama, HHIㅤㅤㅤ
Honeywell PLC System (Softmaster) Engineeringㅤㅤㅤ
PLC Logic Programming -ㅤㅤㅤ
HMI Graphic Design & Implementation -ㅤㅤㅤ
FAT (Loop Check) -ㅤㅤㅤ
SAT & Site Commissioning -ㅤㅤㅤ
2013.12 ~ 2015.01
2012
2012.03 ~ 2012.11
ㅤㅤㅤ T-GAS Power Plant, HHI
ㅤㅤㅤ Emerson DCS System (Delta-V) Engineering
ㅤㅤㅤ - Database Arrange
ㅤㅤㅤ - Programming and HMI Graphic Modification
ㅤㅤㅤ - Pre-FAT
ㅤㅤㅤ - Loop Test & Site Commissioning
2011
HKSilicon Yeosu Plant, Yeosuㅤㅤㅤ
Honeywell ESD System (Safety Manager R145.1) Engineeringㅤㅤㅤ
Causes & Effect Logic Configure -ㅤㅤㅤ
Causes & Effect Logic Implementation -ㅤㅤㅤ
LG DOW MOD 5 Pilot Projectㅤㅤㅤ
Honeywell DCS System (ExperionPKS R310) Engineeringㅤㅤㅤ
DOW Programming Analyze -ㅤㅤㅤ
Logic & Loop Configure -ㅤㅤㅤ
2011.08 ~ 2012.09
2011.07 ~ 2011.08
2010
2010.12 ~ 2011.07
2010.10 ~ 2011.03
2010.06 ~ 2010.07
ㅤㅤㅤ KCC Yeoju Plant Line 6 Project, Yeoju, KCC E&C
ㅤㅤㅤ AB PLC System (RSLogix 5000) Engineering
ㅤㅤㅤ for Hot End Control System
ㅤㅤㅤ - Programming Analyze & Modification
ㅤㅤㅤ - Emerson DCS (Delta V) System HMI Graphic Modification
ㅤㅤㅤ Doosan Heavy Industries Co.,Ltd Project
ㅤㅤㅤ Emerson DCS System (Delta V) Engineering
ㅤㅤㅤ - System Design & Implementation
ㅤㅤㅤ - HMI Graphic Design & Implementation
ㅤㅤㅤ - Pre-FAT
ㅤㅤㅤ - Loop Test & Site Commissioning
ㅤㅤㅤ NFRI NBI System
ㅤㅤㅤ Honeywell DCS System Engineering
ㅤㅤㅤ - System Design & Implementation
ㅤㅤㅤ - Site Commissioning
2009
GHECO-ONE 66OMW Coal-Fired Power Plant, Thailand, Doosanㅤㅤㅤ
Honeywell DCS System (Experion PKS R310) Engineeringㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤ
Yerevan Combined Cycle Power Plant, Armenia, GS E&Cㅤㅤㅤ
Honeywell DCS System (Experion PKS R310) Engineeringㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤ
HMI Graphic Design & Implementation -ㅤㅤㅤ
Site Commissioning -ㅤㅤㅤ
2009.09 ~ 2010.05
2009.01 ~ 2010.05
2008
2008.01 ~ 2008.02
ㅤㅤㅤ Honam Petrochemical
ㅤㅤㅤ Honeywell DCS System Engineering
ㅤㅤㅤ - System Design & Implementation
ㅤㅤㅤ - Site Commissioning
2007
Hanjin LNG Carrierㅤㅤㅤ
Honeywell DCS System Engineeringㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤ
Commissioning -ㅤㅤㅤ
DSME LNG Carrierㅤㅤㅤ
Honeywell DCS System Engineeringㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤ
Commissioning -ㅤㅤㅤ
2007.10 ~ 2008.05
2007.07 ~ 2008.05
2006
2006.12
ㅤㅤㅤ Yeochun NCC #1 Revamping Project, Yeosu
ㅤㅤㅤ Honeywell DCS System Engineering
ㅤㅤㅤ - System Design & Implementation
ㅤㅤㅤ - Site Commissioning
2005
Spring Garden GEN. Station Low Speed Diesel Power Plant,ㅤㅤㅤ
Barbados, HECㅤㅤㅤ
Honeywell DCS System (Experion PKS) Engineeringㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤ
Commissioning -ㅤㅤㅤ
LG Bohai VCM - EDCㅤㅤㅤ
MMS GE System Engineeringㅤㅤㅤ
System Cabinet (18ea) Engineering -ㅤㅤㅤ
FAT Support -ㅤㅤㅤ
2005.11
2005.09
2004
2004.12
2004.06
ㅤㅤㅤ Qatar Petroleum LPG Tank Termiral, Qatar
ㅤㅤㅤ Honeywell DCS System Engineering
ㅤㅤㅤ - System Design (Documentation)m
ㅤㅤㅤ Gympo Landfill
ㅤㅤㅤ Honeywell DCS System
ㅤㅤㅤ - System Design & Implementation
ㅤㅤㅤ - FAT & SAT Support
ㅤㅤㅤ - Site Commissioning
2003
Myungji Incinerator, Busanㅤㅤㅤ
Honeywell DCS System Engineeringㅤㅤㅤ
System Design & Implementation -ㅤㅤㅤ
Site Commissioning -ㅤㅤㅤ
2003.09 ~ 2008.01